Upon completion of construction of the pipeline and canal system, CWA will be responsible for maintaining these facilities. CWA personnel and equipment necessary to provide this maintenance will be stationed at a new Canal maintenance Facility which will be constructed at the intersection of the new canal system and State Highway SH 321 in Liberty County.

 

The Canal Maintenance Facility will sit on approximately 3.5 acres and have the following: offices and personnel break room, vehicle maintenance shop, equipment maintenance shop, fueling facilities, warehouse, detention basin, access drive and road, perimeter fencing, and materials laydown yard.

 

CWA’s engineering firm, Huitt Zollars,  completed the design in late 2016.  CWA will begin contractor procurement in April 2017 and will utilize a Competitive Sealed Proposal process for contractor selection.  CSP documents, plans and specifications will be available through Civcast USA and documents link.

 

 LBITP CMF 3D